Thursday, 15 December 2016

Women in Mainstream - Lesson 3

Lesson 3- Plan Phase
3.1 Work Breakdown, Products and Milestones:
            List the project task and, if possible at this stage include the sub-tasks. For each task add the product that will be created and indicate it will be a milestone.


·         Classroom instruction: 1)Basics of role of women in present day society 2) status of women 3)women empowerment
·         Select student groups
·         Giving task to student groups
·         Research :online and library(research report)
·         Survey: Data collection of working women’s in their locality
·         Class activity: Prepare a chart on women leaders of India
·         Activity: Make a report of the debate conducted in class
·         Presentation: The importance of women in present day
·         Celebration:” Mini exhibition “on Women empowerment

3.2 Role definitions:
            List the roles team members will fulfill in the project.
Project leader: Teacher will fulfill this role
Researcher: All students will be part of online research and library research
Survey writer: Surveyor(all students will contribute to this)
Presentation author: Presenter (all students will take some part in the presentation.)

3.3 Task schedule:
            Note start and end dates for the project.
                Include expected dates to start specific tasks


3.4Special Activities Plan:
                List any special activities (e.g. Field trips or guest speakers) including dates.

           
3.5Resources Plan:
List resources that will be required during the project and any other date constraints associated with them.
Computer lab: Date and period in the Time Table

3.6 Direct Instruction:
List any planned direct instruction sessions and link them to specific tasks if appropriate.
·         Direct sessions on women empowerment
·         Status of women
·         Creating a survey

3.7 Reviews and checkpoints:
                Describe how you will incorporate review meetings and checkpoints in the project
At the end of every week there will be a 20 minutes class conference to discuss progress, successes and challenges.
A checkpoint meeting for each team will be held for 10 minutes twice per week.

3.8 Assessment plan:
            Describe the balanced assessment plan for the project. List products that will be assessed during the project. List rubrics that need to be created before project launch.

Authentic assessment: 1.How many female teachers are working in school? 2. Surveys and results.3.Presentations.
Summative assessment will be performed on the survey results and presentations.
Rubrics prepared: Preparation of questionnaire and result rubrics, data sheet rubrics and statistical analysis.